|
At
approximately 1915hrs on Wednesday, August 15, the Brooklyn
Structure box was dispatched for a residential fire. On the
assignment: HBE1, HBE2, UE6, HBT3, UT, UTWR3, HBR4, R18 and a
BLS rig from Montrose. Hop Bottom 14 arrived with a working
residential fire and assigned HBE1 to layout from the corner and
HBE2 to pick up the lay and head for water. The crew from HBE1
stretched a line to division 1 where high heat was found with no
fire. The crew relocated to an exterior entrance to the
basement where heavy fire was located. UTWR3 arrived and split
with a crew laddering the roof for ventilation and the other
taking a line in division 1. R18 arrived and established the
staging for the RIT gear while a walk around was completed. The
Rescue crew also opened up division 1 and threw multiple ground
ladders. Harford and Nicholson were special called for
additional staffing. HBE2 and UE6 both served as water supply
to the scene via LDH. Rescue 18 served as the command
post, lighting and air unit along with equipment assisting in rehab.
Units cleared just before 2200hrs.

Photo By Renee Coy |

Photo By Renee Coy

Photo By Renee Coy |