Brush Fire With Extension to Structure


On the afternoon on Tuesday March 24, 2009 crews were back at station cleaning up from the last two fire when the phone rang for the report of a Brush and Barn fire on Phillips Rd in Bridgewater Twp. Crews were pulling out of station when the comm center dispatched for the same fire. United tower, tanker engine 2 and Engine 6 would respond. United 11 would also request the next two tankers to the scene bringing Rust and Forest lake. United 11 would arrive to find a small brush fire with an out building fully involved and fire extending to 3 other outbuildings and a track loader. The tower would lay in from the bottom of the driveway and deploy two attack lines. Engine 6 backed up the road and prepared to lay down the hill to the creek. The tanker arrived and supplied the tower. Crews stopped the fire quickly with minimal damage to the 3 exposure buildings and the loader. Crews operated for about 45 min's overhauling and checking for hot spots. there were no injuries reported. (Audio)

Back

Hit Counter